From enquiry to delivered structure
Six steps from the first technical documents to the inspected, documented handover of the finished structure or component.
- Input
- Customer documentation
- Route
- Project-defined processes
- Output
- Agreed delivery condition
Six steps from requirement to production
- 01
Share
Provide the non-confidential scope, material, geometry, quantity and timing.
- 02
Review
AMM reviews the available documentation and required manufacturing responsibility.
- 03
Define
Agree the production route, interfaces, quality requirements and delivery state.
- 04
Prepare
Approve the required tooling, material and process documentation.
- 05
Produce
Carry out the agreed machining, joining, finishing and assembly stages.
- 06
Close
Complete inspection, records and the agreed handover.
Define the route before release
Clear inputs, responsibility and acceptance requirements reduce ambiguity between engineering, production and quality.
Define the handover before production
The manufactured state, inspection records, documentation and logistics handover are agreed during the enquiry stage.
Bring the requirementBuild the right route
Basic project information is enough for the first contact.